The promoter's model showed a ten-year mine. Honeycomb found four years of ore.

An investor was deciding whether to fund a single-asset gold project. Honeycomb checked the promoter's throughput against the resource and its costs against operating reality. Neither held up.

10 yr to 4 yrmodelled mine life corrected
US$48.7Mpromoter NPV found inflated
~8 kozscheduled metal missing from the resource
US$250-300/ozAISC understatement

What Honeycomb found

The mine life failed the throughput

At the promoter's own 150 ktpa processing rate, the resource was exhausted in about four years, not ten.

The schedule used ounces that are not there

Years five to seven depended on roughly 8 koz the current resource did not contain, with every unproven ounce treated as certain.

The costs were too low to hold

The US$925/oz AISC assumed a gravity-only circuit, faultless logistics, and no ESG cost. A realistic cost deck removed most of the margin.

The shift

About four years at the model's own throughput

Before: A ten-year mine life

Roughly 9 koz per year implied by the same grade and rate

Before: 5 koz per year, flat for a decade

Inflated once realistic costs and resource limits are applied

Before: NPV of US$48.7M at 8%

Outcome

The investor's question changed from how much to commit to whether the project was fundable at all, answered in a first-pass review.